🐾
THE FLOODED WORKSHOP
Act I β€’ Stage 1
⚑
100 / 100
READY
πŸͺ™ 150
πŸ’Ž 10
TASK 1/3
Turn the Red Water Valve
Rotate the handwheel mounted on the blue water pipe at (4, 5) to drain the canal & raise the bridge!
πŸ“ LEVEL RADAR DUNGEON
Notice message here